In the course of a maintenance project, the ventilation of the Mittal tunnel on the N06 Gampel - Goppenstein, which was opened in 1986, was renewed.

 

The single-tube tunnel has a length of around 2.5 km and is used by two-way traffic. The new ventilation system is realised by means of longitudinal ventilation and a central extraction system, completion in 2021.

Key data

  • Dismantling of the existing plant

  • Longitudinal ventilation
    12 Jet fans
    Size D1000-112
    Static thrust 1050N

  • Centre extraction system
    2 axial fans (300°C/120min.) in parallel operation, size D2240 Inlet nozzles, transition pieces, diffusers, shut-off dampers, foundation frame, splitter silencers, crane system and bridging steps